This large site was originally the Tenby Electrical works. Acquired by GNNSJ, the site has been divided into several units which are occupied by Legrand Electric, Play Football and a private School Sports Facility. In addition a purpose built detached private school has been constructed in the grounds. The complex occupies several acres and is accessed via a gate-house.
Fixfire upgraded the existing 'closed-protocol' Fire Alarm System with a new networked system which now comprises five networked ADV Range Control panels. Each area is separately protected and controlled so the various entities can control their systems whilst maintaining a site wide-connection.
Fixfire provides full planned and reactive maintenance in accordance with BS requirements.